Video
Our informational movie comes in two sizes- the full version at about 5 minutes, and the short overview that plays through in 2 minutes. Click on each link below to view the video:
We have provided the following video of testing, installation and operation of debris deflection systems:
FHWA: In 2000, Debris Free tested our prototype system at the FHWA lab at Turner-Faribanks. This video shows a 1/5 scale model of our Bridgeshark system.
Camino Cielo: Ventura County, California- this culvert was one of the first sites equipped with a Generation-1 Debris Sweeper. This short clip shows the system turning a tree through a double-barrel box culvert.
Nevada DOT: In 2006, a MOAB system on US-95A was retrofit with the now-standard hinged fin. This video shows the process.
Kansas DOT: Installing MOAB systems from start to finish. One of three sites installed in 2006 in Kansas.
Sacramento River: This MOAB system protects a dock from debris on the Sacramento River. Upstream from this site, we are currently testing new debris deflection systems.
